Case study · Principal ContractorCommercial Unit,
Commercial Unit,
High Wycombe
Full strip out and enabling works over 3 floors after a 15-year NHS tenancy — as principal contractor.
3
Floors
15yr
Tenancy cleared
Project photography — coming soon
Project brief
Approached by the property owner for a complete strip out after the NHS vacated following a 15-year tenancy. Acting as principal contractor for the full strip out and enabling works across three floors — removing rolla racking, mezzanine floors, isolating and removing M&E services and air conditioning, then the safe removal of all partitions, floor coverings and ceilings.
Our rolePrincipal Contractor
Highlights
- Principal contractor role
- Mezzanine and racking removal
- Full M&E isolation and removal
- Three floors back to shell
Need help with a strip out project like this?
Get in touch today for a FREE, no-obligation quotation.