Full strip out and enabling works over 3 floors after a 15-year NHS tenancy — as principal contractor.

3
Floors
15yr
Tenancy cleared
Project photography — coming soon

Project brief


Approached by the property owner for a complete strip out after the NHS vacated following a 15-year tenancy. Acting as principal contractor for the full strip out and enabling works across three floors — removing rolla racking, mezzanine floors, isolating and removing M&E services and air conditioning, then the safe removal of all partitions, floor coverings and ceilings.

Our rolePrincipal Contractor

Highlights


  • Principal contractor role
  • Mezzanine and racking removal
  • Full M&E isolation and removal
  • Three floors back to shell